Permit: TC-RES-1225-06113
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
2048 E HAWTHORNE ST
Address NEW:
2048 E HAWTHORNE ST
Apply Date:
12/22/2025
Applicant:
Aaron Baker
Description:
New ingroud pool & spa with gas heater
Permit Reviews
Permit Number - TC-RES-1225-06113
Permit Status: Inspections complete
Permit Description: New ingroud pool & spa with gas heater
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/24/2025 | RESIDENTIAL POOL v.1 | 01/09/2026 | APPROVED |
Conditions
Permit Number - TC-RES-1225-06113
Permit Status: Inspections complete
Permit Description: New ingroud pool & spa with gas heater
| Date | Description | Comments |
|---|---|---|
| 12/24/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-1225-06113
Permit Description: New ingroud pool & spa with gas heater
Total Completed Inspections - 10
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/02/2026 | PDSD Building Division Pre-Construction Meeting | Passed | ||
| 02/13/2026 | COT - BULD - SWG Clearance | Passed | Gas service needs to be increased; replace existing meter with meter to carry new service. | |
| 02/13/2026 | Pool/Spa - Bonding Grip | Passed | ||
| 02/13/2026 | Pool/Spa - Plumbing | Passed | ||
| 02/13/2026 | Pool/Spa - Pre-Gunite | Passed | ||
| 02/13/2026 | RSEL - Electrical Progress | Passed | ||
| 02/13/2026 | Pool/Spa - Electric | Passed | ||
| 03/26/2026 | Pool/Spa - Final/Barrier | Passed | ||
| 03/26/2026 | RSBU - Building Final | Passed | ||
| 03/26/2026 | COT - RSEL - Electrical Final | Passed |