Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Residential Building - One or Two Family
Address NEW:
1922 E DRACHMAN ST
Apply Date:
12/22/2025
Applicant:
Aaron Baker
Description:
New inground pool & Spa with gas heater

Permit Reviews

Permit Number - TC-RES-1225-06112
Permit Status: Inspections
Permit Description: New inground pool & Spa with gas heater
Start Date Submittal Complete Date Status  
12/24/2025 RESIDENTIAL POOL v.1 01/09/2026 REQUIRES RESUBMIT Review Details
01/23/2026 RESIDENTIAL POOL v.2 01/23/2026 REQUIRES RESUBMIT Review Details
01/26/2026 RESIDENTIAL POOL v.3 02/06/2026 APPROVED Review Details

Conditions

Permit Number - TC-RES-1225-06112
Permit Status: Inspections
Permit Description: New inground pool & Spa with gas heater
Date Description Comments
12/24/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-RES-1225-06112
Permit Description: New inground pool & Spa with gas heater
Total Completed Inspections - 7
Date Description Inspector Results Comments
03/26/2026 COT - BULD - SWG Clearance Passed Okay to backfill all progress areas. Shading required.
Clearance for Southwest Gas. (Pool equipment) 3/26/2026
04/29/2026 PDSD Building Division Pre-Construction Meeting Passed
05/12/2026 Pool/Spa - Pre-Gunite Passed 05/12/2026
Approved per plan - okay to shoot.
05/12/2026 Pool/Spa - Bonding Grip Passed
05/12/2026 Pool/Spa - Electric Passed
05/12/2026 Pool/Spa - Plumbing Passed 05/12/2026
Approved per plan - okay to backfill, shading required.
05/12/2026 RSEL - Electrical Progress Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-DEJONG-CARLETON - SITE PLAN - 1-9-26_V2.PDF DOCUMENTS VIEW
DEJONG-CARLETON - CONSTRUCTION PLAN - 1-16-26_V1.PDF DOCUMENTS VIEW
TUCSON COMMENT LETTER_V1.PDF DOCUMENTS VIEW
AZ 2018 STANDARD PLAN - TUCSON_V1.PDF DOCUMENTS VIEW