Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-1225-06001
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
2602 N PARK AV
Address NEW:
2602 N PARK AV
Apply Date:
12/16/2025
Applicant:
Wes Augustine
Description:
gas line repair
Permit Reviews
Permit Number - TC-RES-1225-06001
Permit Status: Inspections
Permit Description: gas line repair
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/16/2025 | RESIDENTIAL SIMPLE REVIEW v.1 | 12/17/2025 | REQUIRES RESUBMIT |
| 12/18/2025 | RESIDENTIAL SIMPLE REVIEW v.2 | 12/18/2025 | APPROVED |
Conditions
Permit Number - TC-RES-1225-06001
Permit Status: Inspections
Permit Description: gas line repair
| Date | Description | Comments |
|---|---|---|
| 12/16/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-1225-06001
Permit Description: gas line repair
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/29/2025 | RSBU - Building Final | Passed | 12.29.25 Line installed per plan. Lines supported/braced throughout. Shut offs verified. Line pressure verified. Sediment trap verified Approved for SWG clearance |
|
| 12/29/2025 | COT - RSPL - Plumbing Final | Passed | 12.29.25 Line installed per plan. Lines supported/braced throughout. Shut offs verified. Line pressure verified. Sediment trap verified Approved for SWG clearance |
|
| 12/29/2025 | COT - BULD - SWG Clearance | Passed | 12.29.25 Line installed per plan. Lines supported/braced throughout. Shut offs verified. Line pressure verified. Sediment trap verified Approved for SWG clearance |