Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Residential Building - One or Two Family
Address NEW:
2945 N SILVER SPUR DR
Apply Date:
12/01/2025
Applicant:
dora godinez
Description:
SFR

Permit Reviews

Permit Number - TC-RES-1225-05736
Permit Status: Inspections
Permit Description: SFR
Start Date Submittal Complete Date Status  
12/08/2025 RESIDENTIAL NEW DWELLING v.1 12/19/2025 REQUIRES RESUBMIT Review Details
02/06/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/06/2026 APPROVED Review Details
12/29/2025 RESIDENTIAL NEW DWELLING v.2 01/06/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-RES-1225-05736
Permit Status: Inspections
Permit Description: SFR
Total Outstanding Activity Conditions - 1
Date Name
12/11/2025 Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections.

Conditions

Permit Number - TC-RES-1225-05736
Permit Status: Inspections
Permit Description: SFR
Date Description Comments
12/08/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
12/08/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
12/11/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-RES-1225-05736
Permite Description: SFR
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
02/03/2026 BULD - Electrical Clearance N/A Not Ready

Completed Inspections

Permit Status: Inspections
Permit Number: TC-RES-1225-05736
Permit Description: SFR
Total Completed Inspections - 9
Date Description Inspector Results Comments
01/14/2026 COT - RSPL - Rough Soil Passed 1.14.26
Approved
01/16/2026 COT - RSBU - Excavation/Rebar/Zoning Passed
01/16/2026 COT - RSBU - Preslab Passed
02/06/2026 BULD - Electrical Clearance Passed
02/06/2026 COT - RSPL - Sewer Passed
02/12/2026 COT - RSBU - Roof Nailing Passed
02/12/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 2.12.25
Plans call for specific 2x8 headers outside of header schedule itself
Partial pass pending properly sized header installation which will be checked at intermediates. Call this inspection back in with intermediate inspection.
Proceed
02/20/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Passed 2/20/26
02/23/2026 COT - RSPL - Gas Pressure Test Passed

Documents

File Name Document Type  
303248_AZ_SEALED_260129_V1.PDF DOCUMENTS VIEW
ROOF LAY OUT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-UPDATED SILVER SPURR PLANS_V2.PDF DOCUMENTS VIEW
ZONING REVIEW COMMENTS FOR PROJECT TC-RES-1225-05736_V1.PDF DOCUMENTS VIEW