Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Inspections
Type:
Residential Building - One or Two Family
Apply Date:
12/24/2024
Applicant:
Chelsea Marshall
Description:
SFR

Permit Reviews

Permit Number - TC-RES-1224-07443
Permit Status: Inspections
Permit Description: SFR
Start Date Submittal Complete Date Status  
02/24/2025 RESIDENTIAL NEW DWELLING v.2 03/10/2025 APPROVED Review Details
03/10/2025 RESTAMP - RESIDENTIAL v.1 03/17/2025 APPROVED Review Details
01/02/2025 RESIDENTIAL NEW DWELLING v.1 02/05/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-RES-1224-07443
Permit Status: Inspections
Permit Description: SFR
Total Outstanding Activity Conditions - 2
Date Name
01/09/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/09/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Conditions

Permit Number - TC-RES-1224-07443
Permit Status: Inspections
Permit Description: SFR
Date Description Comments
01/02/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
01/09/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-RES-1224-07443
Permite Description: SFR
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
05/02/2025 COT - RSBU - Stem Wall/Retaining Wall N/A Not Ready Stem wall (North and West) at 32” - 48”, approximately 215 feet. Ok to grout progress areas.
08/19/2025 COT - RSBU - Masonry Pregrout N/A Partial Pass 7/3/25: upper retaining wall at 27" above finish grade approximately 215' reinforcement per approved plans ok for concrete placement.
8/19/25" upper retaining wall at 5'8"AFF approximately 215' reinforcement per approved plans ok to proceed with concrete placement.
10/06/2025 COT - RSEL - Electrical Underground N/A Partial Pass 10-6-25: partial pass for preslab electrical underground-pending electrical underground on service.
10/06/2025 COT - RSBU - Excavation/Rebar/Zoning N/A Partial Pass 10-6-25: excavation/setbacks and reinforcement verified per plans. Architect to submit an RFI showing anchor bolts installation and elimination of holdowns. Okay for concrete placement between.
10/06/2025 COT - RSBU - Preslab N/A Partial Pass 10-6-25: excavation/setbacks and reinforcement verified per plans. Architect to submit an RFI showing anchor bolts installation and elimination of holdowns. Okay for concrete placement between.
03/24/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Partial Pass 3.24.26
Approved for main structure, partial pass pending rear porch
03/24/2026 COT - RSBU - Interior Shear Bracing N/A Not Ready

Completed Inspections

Permit Status: Inspections
Permit Number: TC-RES-1224-07443
Permit Description: SFR
Total Completed Inspections - 9
Date Description Inspector Results Comments
08/22/2025 COT - RSPL - Sewer Passed OK to cover progress area.
11/26/2025 COT - RSPL - Yard Water Line Passed
11/26/2025 COT - RSPL - Rough Soil Passed 11.26.25
Approved
Please note, the sewer clean out that Todd discussed with the inspector IS mandatory still
12/03/2025 COT - RSEL - Grounding/Bonding Passed
12/03/2025 BULD - Electrical Clearance Passed 12.03.2025
Clearance TEP ECO.
03/02/2026 COT - RSBU - Roof Nailing Passed Ok to,dry-in roof system. Hold downs at shear walls to be installed. Ok to continue framing.
04/29/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Porches approved. Okay to dry in and proceed with lath. 4/29/2026
08/25/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Passed
08/25/2026 COT - RSPL - Gas Pressure Test Passed Passed