Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-1224-07358
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
3726 S BARROW PL
Address NEW:
3726 S BARROW PL
Apply Date:
12/18/2024
Applicant:
Justin Heilig
Description:
exisiting 100 amp under ground fed panel and we want to put in a 200 amp load center in the same location as the 100 amp main panel
Permit Reviews
Permit Number - TC-RES-1224-07358
Permit Status: Complete
Permit Description: exisiting 100 amp under ground fed panel and we want to put in a 200 amp load center in the same location as the 100 amp main panel
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/18/2024 | RESIDENTIAL SIMPLE REVIEW v.1 | 12/18/2024 | APPROVED |
Conditions
Permit Number - TC-RES-1224-07358
Permit Status: Complete
Permit Description: exisiting 100 amp under ground fed panel and we want to put in a 200 amp load center in the same location as the 100 amp main panel
| Date | Description | Comments |
|---|---|---|
| 12/18/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-1224-07358
Permit Description: exisiting 100 amp under ground fed panel and we want to put in a 200 amp load center in the same location as the 100 amp main panel
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/16/2025 | BULD - Electrical Clearance | Passed | 1/16/25 approval for TEP INCR for upgrade to 200amp main panel | |
| 01/16/2025 | COT - RSEL - Electrical Final | Passed | 1/16/25 pass |