Permit: TC-RES-1224-07339
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
1720 S SAN JUAN PL
Address NEW:
1720 S SAN JUAN PL
Apply Date:
12/17/2024
Applicant:
TFS Solar
Description:
Roof mount 4.30kW DC photovoltaic solar system; 10 modules with microinverters, 1 branch, PV Combiner Box, 20A PV breaker on 200A bus with 200A MCB
Permit Reviews
Permit Number - TC-RES-1224-07339
Permit Status: Complete
Permit Description: Roof mount 4.30kW DC photovoltaic solar system; 10 modules with microinverters, 1 branch, PV Combiner Box, 20A PV breaker on 200A bus with 200A MCB
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/18/2024 | RESIDENTIAL SOLAR v.1 | 01/21/2025 | APPROVED |
Conditions
Permit Number - TC-RES-1224-07339
Permit Status: Complete
Permit Description: Roof mount 4.30kW DC photovoltaic solar system; 10 modules with microinverters, 1 branch, PV Combiner Box, 20A PV breaker on 200A bus with 200A MCB
| Date | Description | Comments |
|---|---|---|
| 01/03/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-1224-07339
Permite Description: Roof mount 4.30kW DC photovoltaic solar system; 10 modules with microinverters, 1 branch, PV Combiner Box, 20A PV breaker on 200A bus with 200A MCB
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/06/2025 | Building Inspection - Outside Normal Hours Building Inspection | N/A | Not Applicable | n/a |
| 03/06/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | n/a |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-1224-07339
Permit Description: Roof mount 4.30kW DC photovoltaic solar system; 10 modules with microinverters, 1 branch, PV Combiner Box, 20A PV breaker on 200A bus with 200A MCB
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/06/2025 | BULD - Electrical Clearance | Passed | 3/6/25 approval for TEP DGC/INCR | |
| 03/14/2025 | COT - RSOL - Electrical Final Solar Project | Passed | Passed |