Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address NEW:
3790 E SUN VIEW CT
Apply Date:
12/16/2024
Applicant:
Beth Callender
Description:
Building in ground pool for homeowner No heater, no gas

Permit Reviews

Permit Number - TC-RES-1224-07296
Permit Status: Inspections complete
Permit Description: Building in ground pool for homeowner No heater, no gas
Start Date Submittal Complete Date Status  
12/17/2024 RESIDENTIAL POOL v.1 01/07/2025 APPROVED Review Details

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-1224-07296
Permite Description: Building in ground pool for homeowner No heater, no gas
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
01/17/2025 COT - BULD - SWG Clearance N/A Not Applicable No gas to pool

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-1224-07296
Permit Description: Building in ground pool for homeowner No heater, no gas
Total Completed Inspections - 8
Date Description Inspector Results Comments
01/17/2025 Pool/Spa - Pre-Gunite Passed setbacks and grounding proper, conduit at proper depth, sub panel in -lace, circuits set correctly,rebar and pool depth proper, ok to proceed 1/17/25
01/17/2025 Pool/Spa - Electric Passed setbacks and grounding proper, conduit at proper depth, sub panel in -lace, circuits set correctly,rebar and pool depth proper, ok to proceed 1/17/25 CLEARANCE INCR
01/17/2025 Pool/Spa - Bonding Grip Passed setbacks and grounding proper, conduit at proper depth, sub panel in -lace, circuits set correctly,rebar and pool depth proper, ok to proceed 1/17/25
01/17/2025 RSEL - Electrical Progress Passed setbacks and grounding proper, conduit at proper depth, sub panel in -lace, circuits set correctly,rebar and pool depth proper, ok to proceed 1/17/25
01/17/2025 Pool/Spa - Plumbing Passed setbacks and grounding proper, conduit at proper depth, sub panel in -lace, circuits set correctly,rebar and pool depth proper, ok to proceed 1/17/25
02/07/2025 RSBU - Building Final Passed Passed final 2/7/25 CLEARANCE INCR
02/07/2025 COT - RSEL - Electrical Final Passed Passed final 2/7/25 CLEARANCE INCR
02/07/2025 Pool/Spa - Final/Barrier Passed Passed final 2/7/25 CLEARANCE INCR