Permit: TC-RES-1224-07220
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
673 S PANTANO PW
Address NEW:
673 S PANTANO PW
Apply Date:
12/11/2024
Applicant:
Bradley Richards
Description:
Replace 125amp service like-for like
Permit Reviews
Permit Number - TC-RES-1224-07220
Permit Status: Complete
Permit Description: Replace 125amp service like-for like
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/12/2024 | RESIDENTIAL SIMPLE REVIEW v.1 | 12/13/2024 | APPROVED |
Conditions
Permit Number - TC-RES-1224-07220
Permit Status: Complete
Permit Description: Replace 125amp service like-for like
| Date | Description | Comments |
|---|---|---|
| 12/12/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-1224-07220
Permite Description: Replace 125amp service like-for like
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/03/2025 | BULD - Electrical Clearance | N/A | Canceled | |
| 03/03/2025 | COT - RSEL - Electrical Underground | N/A | Canceled |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-1224-07220
Permit Description: Replace 125amp service like-for like
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/03/2025 | RSEL - Electrical Progress | Passed | ||
| 04/09/2025 | BULD - Electrical Clearance | Passed | Approved 125A service panel upgrade - INCR Clearance was called into TEP at 3:20pm | |
| 04/10/2025 | COT - RSEL - Electrical Final | Passed |