Permit: TC-RES-1224-07197
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2007 S PLUMER AV
Address NEW:
2007 S PLUMER AV
Apply Date:
12/11/2024
Applicant:
Justin Preston
Description:
Installation of 10.0kW (DC) residential roof top solar system with the main panel being upgraded to 200A
Permit Reviews
Permit Number - TC-RES-1224-07197
Permit Status: Complete
Permit Description: Installation of 10.0kW (DC) residential roof top solar system with the main panel being upgraded to 200A
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/13/2024 | RESIDENTIAL SOLAR v.1 | 01/15/2025 | REQUIRES RESUBMIT |
| 01/27/2025 | RESIDENTIAL SOLAR v.2 | 02/10/2025 | APPROVED |
Conditions
Permit Number - TC-RES-1224-07197
Permit Status: Complete
Permit Description: Installation of 10.0kW (DC) residential roof top solar system with the main panel being upgraded to 200A
| Date | Description | Comments |
|---|---|---|
| 01/28/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-1224-07197
Permite Description: Installation of 10.0kW (DC) residential roof top solar system with the main panel being upgraded to 200A
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/25/2025 | BULD - Electrical Clearance | N/A | Not Applicable | duplicate |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-1224-07197
Permit Description: Installation of 10.0kW (DC) residential roof top solar system with the main panel being upgraded to 200A
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/09/2025 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 05/09/2025 | BULD - Electrical Clearance | Passed | 5/8/25 TEP CLEARANCE: DGC |
|
| 05/09/2025 | COT - RSOL - Grounding/Bonding Solar Project | Passed | ||
| 05/09/2025 | RSBU - Building Final | Passed |