Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Address NEW:
1817 N WAGON WHEELS PL
Apply Date:
12/05/2024
Applicant:
Jake Boen
Description:
Kitchen Remodel and Dining Room, Bedroom, Patio Addition

Permit Reviews

Permit Number - TC-RES-1224-07058
Permit Status: Issued
Permit Description: Kitchen Remodel and Dining Room, Bedroom, Patio Addition
Start Date Submittal Complete Date Status  
06/23/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/23/2025 APPROVED Review Details
12/05/2024 RESIDENTIAL NEW DWELLING v.1 01/08/2025 APPROVED Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-RES-1224-07058
Permite Description: Kitchen Remodel and Dining Room, Bedroom, Patio Addition
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
03/26/2025 COT - RSEL - Electrical Underground N/A Not Applicable 3-26-25, not applicable
03/26/2025 COT - RSPL - Rough Soil N/A Not Applicable 3-26-25, not applicable
04/04/2025 COT - RSPL - Gas Pressure Test N/A Partial Pass Partial pass. From gas meter to new riser location. Okay to backfill. Shading is required. 4/4/2025
04/04/2025 COT - BULD - SWG Clearance N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: TC-RES-1224-07058
Permit Description: Kitchen Remodel and Dining Room, Bedroom, Patio Addition
Total Completed Inspections - 14
Date Description Inspector Results Comments
03/26/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 3-26-25, reinforcement/setbacks verified per plan. Okay to pour concrete.
03/26/2025 COT - RSBU - Preslab Passed 3-26-25, preslab approved.
Note: no ufer. Electrical panel will be relocated and contractor will be utilizing ground rods.
04/08/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 4-8-25, exterior clip/sheathing approved. Okay to continue with construction.
04/08/2025 COT - RSBU - Roof Nailing Passed 4-8-25, roof nailing approved. Okay to continue with construction.
04/09/2025 BULD - Electrical Clearance Passed Verbal clearance for TEP INCR. 4/9/2025
04/23/2025 COT - RSPL - Gas Pressure Test Passed Approved. 4/23/2025
04/23/2025 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 4/23/2025
04/23/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/23/2025 COT - RSEL - Grounding/Bonding Passed
06/18/2025 RSBU - Building Final Passed
06/18/2025 COT - RSEL - Electrical Final Passed
06/18/2025 COT - RSEL - Outdoor Lighting Passed
06/18/2025 COT - RSPL - Plumbing Final Passed
06/18/2025 COT - RSME - Mechanical Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-PLAN SET_V1.PDF DOCUMENTS VIEW
MANUAL JSD_V1.PDF DOCUMENTS VIEW