Permit: TC-RES-1224-07026
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2542 E LA CIENEGA DR
Address NEW:
2542 E LA CIENEGA DR
Apply Date:
12/04/2024
Applicant:
TFS Solar
Description:
Roof mount 10.75kW DC photovoltaic solar system; 25 modules and microinverters, 3 branches, PV combiner box, interconnection via 60A meter socket adapter to 200A bus with 200A MCB
Permit Reviews
Permit Number - TC-RES-1224-07026
Permit Status: Complete
Permit Description: Roof mount 10.75kW DC photovoltaic solar system; 25 modules and microinverters, 3 branches, PV combiner box, interconnection via 60A meter socket adapter to 200A bus with 200A MCB
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/06/2024 | RESIDENTIAL SOLAR v.1 | 01/08/2025 | REQUIRES RESUBMIT |
| 01/30/2025 | RESIDENTIAL SOLAR v.2 | 02/13/2025 | APPROVED |
Conditions
Permit Number - TC-RES-1224-07026
Permit Status: Complete
Permit Description: Roof mount 10.75kW DC photovoltaic solar system; 25 modules and microinverters, 3 branches, PV combiner box, interconnection via 60A meter socket adapter to 200A bus with 200A MCB
| Date | Description | Comments |
|---|---|---|
| 02/13/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-1224-07026
Permit Description: Roof mount 10.75kW DC photovoltaic solar system; 25 modules and microinverters, 3 branches, PV combiner box, interconnection via 60A meter socket adapter to 200A bus with 200A MCB
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/07/2025 | RSBU - Building Final | Passed | ||
| 04/07/2025 | COT - RSOL - Electrical Progress Solar Project | Passed | ||
| 04/09/2025 | BULD - Electrical Clearance | Passed |