Permit: TC-RES-1224-07010
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2216 E 5TH ST
Address NEW:
2216 E 5TH ST
Apply Date:
12/03/2024
Applicant:
TFS Solar
Description:
Roof mount 8.60kW DC photovoltaic solar system; 20 modules with microinverters, 2 branches, PV combiner Box, Supply Side Tap between 320A Meter, PV system with 40A fuse OCP, and existing 200A fused service disconnect. Existing 200A MLO load center with 200A bus.
Permit Reviews
Permit Number - TC-RES-1224-07010
Permit Status: Complete
Permit Description: Roof mount 8.60kW DC photovoltaic solar system; 20 modules with microinverters, 2 branches, PV combiner Box, Supply Side Tap between 320A Meter, PV system with 40A fuse OCP, and existing 200A fused service disconnect. Existing 200A MLO load center with 200A bus.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/06/2024 | RESIDENTIAL SOLAR v.1 | 01/07/2025 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-1224-07010
Permite Description: Roof mount 8.60kW DC photovoltaic solar system; 20 modules with microinverters, 2 branches, PV combiner Box, Supply Side Tap between 320A Meter, PV system with 40A fuse OCP, and existing 200A fused service disconnect. Existing 200A MLO load center with 200A bus.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/25/2025 | BULD - Electrical Clearance | N/A | Partial Pass | Partial for the line-side tap - DGL Clearance was called into TEP at 3:50pm Pending solar |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-1224-07010
Permit Description: Roof mount 8.60kW DC photovoltaic solar system; 20 modules with microinverters, 2 branches, PV combiner Box, Supply Side Tap between 320A Meter, PV system with 40A fuse OCP, and existing 200A fused service disconnect. Existing 200A MLO load center with 200A bus.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/26/2025 | COT - RSOL - Electrical Underground Solar Project | Passed | 2/26/25 pass | |
| 02/27/2025 | RSBU - Building Final | Passed | ||
| 02/27/2025 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 02/27/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter |