Permit: TC-RES-1224-06955
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
941 W FARR ST
Address NEW:
941 W FARR ST
Apply Date:
12/02/2024
Applicant:
Jose Murillo
Description:
Electrical Reconnect Code: ce/vio0324/00943 Resolved issue and cleaned up. Need electricity
Permit Reviews
Permit Number - TC-RES-1224-06955
Permit Status: Inspections complete
Permit Description: Electrical Reconnect Code: ce/vio0324/00943
Resolved issue and cleaned up. Need electricity
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/06/2025 | RESIDENTIAL NEW DWELLING REVISION v.1 | 03/06/2025 | REQUIRES RESUBMIT |
| 12/03/2024 | RESIDENTIAL NEW DWELLING v.1 | 12/19/2024 | APPROVED |
Conditions
Permit Number - TC-RES-1224-06955
Permit Status: Inspections complete
Permit Description: Electrical Reconnect Code: ce/vio0324/00943
Resolved issue and cleaned up. Need electricity
| Date | Description | Comments |
|---|---|---|
| 03/27/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-1224-06955
Permit Description: Electrical Reconnect Code: ce/vio0324/00943
Resolved issue and cleaned up. Need electricity
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/15/2025 | COT - RSEL - Electrical Final | Passed | Approved for electrical reconnection- RECN Clearance to TEP is required | |
| 05/19/2025 | BULD - Electrical Clearance | Passed | Approved 200A service panel upgrade - INCR Clearance to TEP is required for the electrical cutover (Revised from RECN 5/15/25) |