Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
941 W FARR ST
Address NEW:
941 W FARR ST
Apply Date:
12/02/2024
Applicant:
Jose Murillo
Description:
Electrical Reconnect Code: ce/vio0324/00943 Resolved issue and cleaned up. Need electricity

Permit Reviews

Permit Number - TC-RES-1224-06955
Permit Status: Inspections complete
Permit Description: Electrical Reconnect Code: ce/vio0324/00943 Resolved issue and cleaned up. Need electricity
Start Date Submittal Complete Date Status  
03/06/2025 RESIDENTIAL NEW DWELLING REVISION v.1 03/06/2025 REQUIRES RESUBMIT Review Details
12/03/2024 RESIDENTIAL NEW DWELLING v.1 12/19/2024 APPROVED Review Details

Conditions

Permit Number - TC-RES-1224-06955
Permit Status: Inspections complete
Permit Description: Electrical Reconnect Code: ce/vio0324/00943 Resolved issue and cleaned up. Need electricity
Date Description Comments
03/27/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-1224-06955
Permit Description: Electrical Reconnect Code: ce/vio0324/00943 Resolved issue and cleaned up. Need electricity
Total Completed Inspections - 2
Date Description Inspector Results Comments
05/15/2025 COT - RSEL - Electrical Final Passed Approved for electrical reconnection- RECN Clearance to TEP is required
05/19/2025 BULD - Electrical Clearance Passed Approved 200A service panel upgrade - INCR Clearance to TEP is required for the electrical cutover (Revised from RECN 5/15/25)

Documents

File Name Document Type  
2025-02-27 07-06_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW