Permit: TC-RES-1223-10258
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
655 N DESERT AV
Address NEW:
655 N DESERT AV
Apply Date:
12/23/2023
Applicant:
Brisa Soto
Description:
Master Bedroom and Bathroom Addition
Permit Reviews
Permit Number - TC-RES-1223-10258
Permit Status: Complete
Permit Description: Master Bedroom and Bathroom Addition
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/26/2023 | RESIDENTIAL NEW DWELLING v.1 | 01/24/2024 | APPROVED |
Conditions
Permit Number - TC-RES-1223-10258
Permit Status: Complete
Permit Description: Master Bedroom and Bathroom Addition
| Date | Description | Comments |
|---|---|---|
| 01/24/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-1223-10258
Permit Description: Master Bedroom and Bathroom Addition
Total Completed Inspections - 11
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 11/13/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 11/19/2024 | BULD - Electrical Clearance | Passed | called in at 9:26. | |
| 11/25/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 12/13/2024 | RSBU - Building Final | Passed | 12-13-24, electrical, mechanical, outdoor lighting, , plumbing, and building final approved. | |
| 12/17/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 12-17-24, excavation/setbacks approved. | |
| 12/17/2024 | COT - RSPL - Rough Soil | Passed | 12-17-24, underground plumbing approved. | |
| 12/17/2024 | COT - RSBU - Preslab | Passed | 12-17-24, preslab approved. | |
| 12/17/2024 | COT - RSEL - Electrical Final | Passed | 12-17-24, electrical final approved. | |
| 12/17/2024 | COT - RSME - Mechanical Final | Passed | 12-17-24, mechanical final approved. | |
| 12/17/2024 | COT - RSPL - Plumbing Final | Passed | 12-17-24, plumbing final approved. |