Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
905 S KROEGER LN
Address NEW:
905 S KROEGER LN
Apply Date:
12/21/2023
Applicant:
Joey Rogers
Description:
Relocate and upgrade existing panel and service. Currently the small panel is located on a later addition (poorly constructed and not to code). After electric is moved, I will submit for a demolition permit of the front addition.

Permit Reviews

Permit Number - TC-RES-1223-10220
Permit Status: Complete
Permit Description: Relocate and upgrade existing panel and service. Currently the small panel is located on a later addition (poorly constructed and not to code). After electric is moved, I will submit for a demolition permit of the front addition.
Start Date Submittal Complete Date Status  
12/21/2023 RESIDENTIAL SIMPLE REVIEW v.1 12/21/2023 APPROVED Review Details

Conditions

Permit Number - TC-RES-1223-10220
Permit Status: Complete
Permit Description: Relocate and upgrade existing panel and service. Currently the small panel is located on a later addition (poorly constructed and not to code). After electric is moved, I will submit for a demolition permit of the front addition.
Date Description Comments
12/21/2023 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
12/21/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-1223-10220
Permit Description: Relocate and upgrade existing panel and service. Currently the small panel is located on a later addition (poorly constructed and not to code). After electric is moved, I will submit for a demolition permit of the front addition.
Total Completed Inspections - 3
Date Description Inspector Results Comments
02/07/2024 BULD - Electrical Clearance Passed Approved service panel upgrade, INCR Clearance to TEP is required for the cutover
08/07/2024 COT - RSEL - Electrical Final Passed
08/07/2024 RSEL - Electrical Progress Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
KROEGER LN_ELECTRIC RELOCATION SITE PLAN_V1.PDF DOCUMENTS VIEW