Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Apply Date:
12/21/2023
Applicant:
Kevin Flaws
Description:
INSTALLATION OF AN ADDITIONAL 12 - 400W MODULE, 4.8kW DC / 3.89kW AC WITH ENPHASE MICRO INVERTERS AND COMBINE TO EXISTING 20 - 250W MODULE, 5.0kW DC / 5.0kW AC WITH SMA 5.0kW STRING INVERTER SYSTEM; FLUSH-ROOF MOUNTED ON EXISTING AVAILABLE PITCH COMPOSITE SHINGLE ROOF PLANE.

Permit Reviews

Permit Number - TC-RES-1223-10218
Permit Status: Inspections complete
Permit Description: INSTALLATION OF AN ADDITIONAL 12 - 400W MODULE, 4.8kW DC / 3.89kW AC WITH ENPHASE MICRO INVERTERS AND COMBINE TO EXISTING 20 - 250W MODULE, 5.0kW DC / 5.0kW AC WITH SMA 5.0kW STRING INVERTER SYSTEM; FLUSH-ROOF MOUNTED ON EXISTING AVAILABLE PITCH COMPOSITE SHINGLE ROOF PLANE.
Start Date Submittal Complete Date Status  
01/18/2024 RESIDENTIAL SOLAR v.2 01/22/2024 APPROVED Review Details
12/21/2023 RESIDENTIAL SOLAR v.1 01/12/2024 REQUIRES RESUBMIT Review Details

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-1223-10218
Permit Description: INSTALLATION OF AN ADDITIONAL 12 - 400W MODULE, 4.8kW DC / 3.89kW AC WITH ENPHASE MICRO INVERTERS AND COMBINE TO EXISTING 20 - 250W MODULE, 5.0kW DC / 5.0kW AC WITH SMA 5.0kW STRING INVERTER SYSTEM; FLUSH-ROOF MOUNTED ON EXISTING AVAILABLE PITCH COMPOSITE SHINGLE ROOF PLANE.
Total Completed Inspections - 3
Date Description Inspector Results Comments
02/22/2024 RSBU - Building Final Passed Project complete
02/22/2024 COT - RSOL - Electrical Final Solar Project Passed Project complete
02/22/2024 BULD - Electrical Clearance Passed Clear DGC for solar addition.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-2_PLAN SET_V2.PDF DOCUMENTS VIEW