Description:
Installation of new Private water service line from the Meter to 10' outside of the house (house Connection) part of Rodeo addition phase 2 TW project. The water line will be a 1-inch pex, buried at 14 inches. 12awg tracer wire will be taped to the pex every ten ft. from the new meter to the tie-in point. The new 5/8 meter will have a 1-inch meter valve installed on the customer's side.

Permit Reviews

Permit Number - TC-RES-1223-10061
Permit Status: Complete
Permit Description: Installation of new Private water service line from the Meter to 10' outside of the house (house Connection) part of Rodeo addition phase 2 TW project. The water line will be a 1-inch pex, buried at 14 inches. 12awg tracer wire will be taped to the pex every ten ft. from the new meter to the tie-in point. The new 5/8 meter will have a 1-inch meter valve installed on the customer's side.
Start Date Submittal Complete Date Status  
12/13/2023 RESIDENTIAL SIMPLE REVIEW v.1 12/14/2023 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-1223-10061
Permite Description: Installation of new Private water service line from the Meter to 10' outside of the house (house Connection) part of Rodeo addition phase 2 TW project. The water line will be a 1-inch pex, buried at 14 inches. 12awg tracer wire will be taped to the pex every ten ft. from the new meter to the tie-in point. The new 5/8 meter will have a 1-inch meter valve installed on the customer's side.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
07/26/2024 RSPL - Plumbing Progress N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-1223-10061
Permit Description: Installation of new Private water service line from the Meter to 10' outside of the house (house Connection) part of Rodeo addition phase 2 TW project. The water line will be a 1-inch pex, buried at 14 inches. 12awg tracer wire will be taped to the pex every ten ft. from the new meter to the tie-in point. The new 5/8 meter will have a 1-inch meter valve installed on the customer's side.
Total Completed Inspections - 3
Date Description Inspector Results Comments
07/26/2024 COT - RSPL - Yard Water Line Passed
07/26/2024 COT - RSPL - Plumbing Final Passed Approved 1"PEX yard water line from new meter location to house tie-in, okay to shade and backfill progress areas
07/26/2024 COT - RSPL - Rough Soil Passed