Permit: TC-RES-1222-01501
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
750 E CALLE BAYONA
Address NEW:
750 E CALLE BAYONA
Apply Date:
12/14/2022
Applicant:
Arturo Elizalde
Description:
Single Family Residence
Permit Reviews
Permit Number - TC-RES-1222-01501
Permit Status: Complete
Permit Description: Single Family Residence
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/03/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 05/05/2023 | APPROVED |
| 01/10/2023 | RESIDENTIAL NEW DWELLING v.1 | 02/07/2023 | REQUIRES RESUBMIT |
| 03/21/2023 | RESIDENTIAL NEW DWELLING v.2 | 04/19/2023 | APPROVED |
| 04/27/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/01/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-1222-01501
Permit Status: Complete
Permit Description: Single Family Residence
| Date | Description | Comments |
|---|---|---|
| 04/20/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/integrated-planning/PDSD/PDSD_Owner_Builder_Affidavit.pdf, is required prior to issuance of permit. | |
| 04/20/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 02/07/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-1222-01501
Permite Description: Single Family Residence
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/26/2023 | COT - RSPL - Plumbing Final | N/A | Not Ready | 6/26/23: Cancelled by contractor. |
| 06/26/2023 | COT - RSME - Mechanical Final | N/A | Not Ready | 6/26/23: Not ready. |
| 06/26/2023 | COT - RSEL - Outdoor Lighting | N/A | Not Ready | 6/26/23: Not ready. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-1222-01501
Permit Description: Single Family Residence
Total Completed Inspections - 15
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/01/2023 | COT - RSPL - Rough Soil | Passed | Underground plumbing is complete per plans. System under a water test. Okay to backfill and compact for Pre-Slab inspection. | |
| 05/05/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 05/05/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Approved. Rebar per plans along with set backs. Okay for concrete placement. 5/5/2023 | |
| 05/05/2023 | COT - RSBU - Preslab | Passed | Approved. Rebar per plans along with set backs. Okay for concrete placement. 5/5/2023 | |
| 05/16/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 05/16/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 05/23/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 06/06/2023 | COT - RSPL - Yard Water Line | Passed | Tracer wire is in. Shading required. 6/6/2023 | |
| 06/21/2023 | BULD - Electrical Clearance | Passed | Approved, ECO Clearance to TEP is required for the construction power | |
| 06/26/2023 | COT - RSPL - Sewer | Passed | ||
| 07/12/2023 | COT - RSPL - Plumbing Final | Passed | 7-12-23: Plumbing fixtures are installed and functional. Exterior hose bibs have backflow prevention installed. Washing machine faucets have water hammer arrestors installed. | |
| 07/21/2023 | COT - RSME - Mechanical Final | Passed | ||
| 07/21/2023 | RSBU - Building Final | Passed | ||
| 07/21/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 07/21/2023 | COT - RSEL - Electrical Final | Passed |