Permit: TC-RES-1222-01460
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
725 E 35TH ST UNIT 1
Address NEW:
725 E 35TH ST UNIT 1
Apply Date:
12/12/2022
Applicant:
Andrew Venne
Description:
Duplex
Permit Reviews
Permit Number - TC-RES-1222-01460
Permit Status: Issued
Permit Description: Duplex
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/20/2023 | RESTAMP - RESIDENTIAL v.1 | 04/21/2023 | APPROVED |
| 07/06/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/21/2023 | APPROVED |
| 03/24/2023 | RESIDENTIAL NEW DWELLING v.3 | 04/20/2023 | APPROVED |
| 01/15/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/15/2025 | APPROVED |
| 01/17/2023 | RESIDENTIAL NEW DWELLING v.1 | 02/17/2023 | REQUIRES RESUBMIT |
| 03/05/2023 | RESIDENTIAL NEW DWELLING v.2 | 03/21/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-1222-01460
Permit Status: Issued
Permit Description: Duplex
| Date | Description | Comments |
|---|---|---|
| 05/31/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/integrated-planning/PDSD/PDSD_Owner_Builder_Affidavit.pdf, is required prior to issuance of permit. | |
| 03/06/2023 | A final elevation certificate is required before final inspection | |
| 03/06/2023 | An intermediate elevation certificate of the formed pre-slab is required before pre-slab inspection | |
| 04/20/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 07/21/2023 | Soils and aggregate report | |
| 03/21/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-RES-1222-01460
Permite Description: Duplex
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/26/2023 | COT - RSEL - Grounding/Bonding | N/A | Not Ready | |
| 06/26/2023 | COT - RSBU - Preslab | N/A | Not Ready | |
| 06/26/2023 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: TC-RES-1222-01460
Permit Description: Duplex
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/21/2023 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 6/21/2023 | |
| 06/21/2023 | COT - RSPL - Sewer | Passed | Call 30 min before arriving. Jesus at 520-904-8046. 725 E 35th St, | |
| 07/12/2023 | COT - RSEL - Grounding/Bonding | Passed | Footings are properly dug, rebar reinforcement is in place, wire mesh for concrete slab is installed. Ufer ground is installed in the northwest corner of building. | |
| 07/12/2023 | COT - RSBU - Preslab | Passed | Footings are properly dug, rebar reinforcement is in place, wire mesh for concrete slab is installed. Ufer ground is installed in the northwest corner of building. | |
| 07/12/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Footings are properly dug, rebar reinforcement is in place, wire mesh for concrete slab is installed. Ufer ground is installed in the northwest corner of building. | |
| 08/10/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 08/10/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 09/06/2023 | COT - RSPL - Yard Water Line | Passed | ||
| 09/22/2023 | COT - BULD - SWG Clearance | Passed | Clearance for Southwest Gas both units 1 and 2. 9/22/2023 12/22/23- clearance resent to SWG |
|
| 09/22/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 09/22/2023 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 09/22/2023 | COT - RSPL - Gas Pressure Test | Passed | Gas pressure test approved on both units. 9/22/2023 | |
| 09/27/2023 | BULD - Electrical Clearance | Passed | Approved Duplex service panels, ECO Clearance to TEP is required for unit #1 and unit #2 | |
| 10/17/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 12/22/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 12/22/2023 | COT - RSEL - Electrical Final | Passed | ||
| 12/22/2023 | COT - RSME - Mechanical Final | Passed | ||
| 12/27/2023 | RSBU - Building Final | Passed | recommend for C/O | |
| 12/28/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 12/28/2023 | COT - RSEL - Electrical Underground | Passed |