Permit: TC-RES-1126-06226
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
915 S BEAN AV
Address NEW:
915 S BEAN AV
Apply Date:
11/09/2026
Applicant:
Trinidad Valencia
Description:
New Yard Water Line from meter to New Structure
Permit Reviews
Permit Number - TC-RES-1126-06226
Permit Status: Complete
Permit Description: New Yard Water Line from meter to New Structure
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/10/2026 | RESIDENTIAL SIMPLE REVIEW v.1 | 11/10/2026 | APPROVED |
Conditions
Permit Number - TC-RES-1126-06226
Permit Status: Complete
Permit Description: New Yard Water Line from meter to New Structure
| Date | Description | Comments |
|---|---|---|
| 11/10/2026 | Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-1126-06226
Permit Description: New Yard Water Line from meter to New Structure
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/17/2026 | COT - RSPL - Plumbing Final | Passed | 11-17-26 trench depth is at 14'' water psi at 50, tracer wire verified from water meter box to point of connection. Sleeve added near tree for root protection. Water line comes to dead in 5' from structure. See plans - approved | |
| 11/17/2026 | COT - RSPL - Yard Water Line | Passed | 11-17-26 trench depth is at 14'' water psi at 50, tracer wire verified from water meter box to point of connection. Sleeve added near tree for root protection. Water line comes to dead in 5' from structure. See plans - approved | |
| 11/17/2026 | COT - RSPL - Rough Soil | Passed | 11-17-26 trench depth is at 14'' water psi at 50, tracer wire verified from water meter box to point of connection. Sleeve added near tree for root protection. Water line comes to dead in 5' from structure. See plans - approved |