Permit: TC-RES-1125-05714
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
994 N CARIBE AV
Address NEW:
994 N CARIBE AV
Apply Date:
11/26/2025
Applicant:
Juana Quiroz
Description:
REV_1, Disconnect Revised; 6.450 kW DC ROOF MOUNTED SOLAR + BATTERY
Permit Reviews
Permit Number - TC-RES-1125-05714
Permit Status: Inspections
Permit Description: REV_1, Disconnect Revised; 6.450 kW DC ROOF MOUNTED SOLAR + BATTERY
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/28/2025 | RESIDENTIAL SOLAR v.1 | 12/12/2025 | APPROVED |
| 12/19/2025 | RESIDENTIAL SOLAR REVISION v.1 | 12/23/2025 | APPROVED |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-RES-1125-05714
Permite Description: REV_1, Disconnect Revised; 6.450 kW DC ROOF MOUNTED SOLAR + BATTERY
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/05/2026 | BULD - Electrical Clearance | N/A | Re-inspection required | Reinspection required. Solar inspections with the city are done virtually, tech needed on site for inspection or full install pictures required to be uploaded. |
| 02/05/2026 | RSBU - Building Final | N/A | Re-inspection required | Reinspection required. Solar inspections with the city are done virtually, tech needed on site for inspection or full install pictures required to be uploaded. |
| 02/05/2026 | COT - RSOL - Electrical Final Solar Project | N/A | Re-inspection required | Reinspection required. Solar inspections with the city are done virtually, tech needed on site for inspection or full install pictures required to be uploaded. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-1125-05714
Permit Description: REV_1, Disconnect Revised; 6.450 kW DC ROOF MOUNTED SOLAR + BATTERY
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/12/2026 | BULD - Electrical Clearance | Passed | Clearance for TEP DGC/DGL/BAT. 2/12/2026 | |
| 02/12/2026 | RSBU - Building Final | Passed | ||
| 02/12/2026 | COT - RSOL - Electrical Final Solar Project | Passed |