Permit: TC-RES-1125-05673
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
2527 E 3RD ST
Address NEW:
2527 E 3RD ST
Apply Date:
11/24/2025
Applicant:
Inty Ops
Description:
REV_2, Disco revisions; REV_1, AC Coupling reconfigured; Installation of a 11.50 kW (AC) PV System + Battery Integrated
Permit Reviews
Permit Number - TC-RES-1125-05673
Permit Status: Inspections
Permit Description: REV_2, Disco revisions; REV_1, AC Coupling reconfigured; Installation of a 11.50 kW (AC) PV System + Battery Integrated
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/07/2026 | RESIDENTIAL SOLAR REVISION v.1 | 01/13/2026 | APPROVED |
| 12/15/2025 | RESIDENTIAL SOLAR REVISION v.1 | 12/22/2025 | APPROVED |
| 11/25/2025 | RESIDENTIAL SOLAR v.1 | 12/10/2025 | APPROVED |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-1125-05673
Permit Description: REV_2, Disco revisions; REV_1, AC Coupling reconfigured; Installation of a 11.50 kW (AC) PV System + Battery Integrated
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/24/2026 | BULD - Electrical Clearance | Passed | 2.24.26 Pv System is installed per plans. Approved for DGC/BAT clearance to TEP |
|
| 02/24/2026 | RSBU - Building Final | Passed | ||
| 02/24/2026 | COT - RSOL - Electrical Final Solar Project | Passed | 2.24.26 approved |