Permit: TC-RES-1125-05568
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
12791 E TORTOISE POINTE DR
Address NEW:
12791 E TORTOISE POINTE DR
Apply Date:
11/17/2025
Applicant:
Albert Montoya
Description:
Ramada
Permit Reviews
Permit Number - TC-RES-1125-05568
Permit Status: Inspections complete
Permit Description: Ramada
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/21/2025 | RESIDENTIAL ADD/ALT v.1 | 12/23/2025 | REQUIRES RESUBMIT |
| 01/07/2026 | RESIDENTIAL ADD/ALT v.2 | 01/07/2026 | REQUIRES RESUBMIT |
| 01/12/2026 | RESIDENTIAL ADD/ALT v.3 | 01/26/2026 | APPROVED |
Conditions
Permit Number - TC-RES-1125-05568
Permit Status: Inspections complete
Permit Description: Ramada
| Date | Description | Comments |
|---|---|---|
| 11/21/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-1125-05568
Permit Description: Ramada
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/09/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 02/09/2026 Approved per site plan and revised setbacks in plan. Verified column footings per detail - okay for concrete placement and first 4' lift. |
|
| 02/19/2026 | COT - RSBU - Masonry Pregrout | Passed | 2/19/26 passed final lift | |
| 03/04/2026 | COT - RSBU - Roof Nailing | Passed | 03/04/2026 Ramada approved per plan and framing details and nail schedule. |
|
| 03/20/2026 | RSBU - Building Final | Passed | ||
| 03/20/2026 | COT - RSEL - Electrical Final | Passed |