Permit: TC-RES-1125-05564
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
6823 S 6TH AV
Address NEW:
6823 S 6TH AV
Apply Date:
11/17/2025
Applicant:
Al Coronado
Description:
Whole home re-pipe, PEX transitions, copper stub outs Fixture count 24 Water heater replacement, 40-gallon gas, like for like
Permit Reviews
Permit Number - TC-RES-1125-05564
Permit Status: Inspections
Permit Description: Whole home re-pipe, PEX transitions, copper stub outs
Fixture count 24
Water heater replacement, 40-gallon gas, like for like
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/18/2025 | RESIDENTIAL SIMPLE REVIEW v.1 | 11/18/2025 | APPROVED |
Conditions
Permit Number - TC-RES-1125-05564
Permit Status: Inspections
Permit Description: Whole home re-pipe, PEX transitions, copper stub outs
Fixture count 24
Water heater replacement, 40-gallon gas, like for like
| Date | Description | Comments |
|---|---|---|
| 11/18/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-1125-05564
Permit Description: Whole home re-pipe, PEX transitions, copper stub outs
Fixture count 24
Water heater replacement, 40-gallon gas, like for like
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/28/2025 | RSBU - Building Final | Passed | ||
| 11/28/2025 | COT - RSPL - Plumbing Final | Passed | 11.28.2025 Approved per plan, verified PEX protected 6" from water heater flue with insulation and had 18" metal piping from tank. Also verified bracing of new water distribution lines to fixtures and, where required, hammer arresters and shutoff valves easily accessible. |
|
| 11/28/2025 | RSPL - Plumbing Progress | Passed |