Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-1125-05551
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
1339 E 8TH ST UNIT 1
Address NEW:
1339 E 8TH ST UNIT 1
Apply Date:
11/17/2025
Applicant:
Cesar Bravo
Description:
100 amp to 200 amp electric panel upgrade, existing main breaker is burn out
Permit Reviews
Permit Number - TC-RES-1125-05551
Permit Status: Complete
Permit Description: 100 amp to 200 amp electric panel upgrade, existing main breaker is burn out
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/17/2025 | RESIDENTIAL SIMPLE REVIEW v.2 | 11/17/2025 | APPROVED |
| 11/17/2025 | RESIDENTIAL SIMPLE REVIEW v.1 | 11/17/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-1125-05551
Permit Status: Complete
Permit Description: 100 amp to 200 amp electric panel upgrade, existing main breaker is burn out
| Date | Description | Comments |
|---|---|---|
| 11/17/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-1125-05551
Permit Description: 100 amp to 200 amp electric panel upgrade, existing main breaker is burn out
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/28/2026 | BULD - Electrical Clearance | Passed | 01/28/2026 Clearance TEP INCR for 200A MPU at 2:35pm. |
|
| 01/28/2026 | COT - RSEL - Electrical Final | Passed | 01/28/2026 Verified circuits landed and labeled. |