Permit: TC-RES-1125-05488
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
12791 E TORTOISE POINTE DR
Address NEW:
12791 E TORTOISE POINTE DR
Apply Date:
11/12/2025
Applicant:
Albert Montoya
Description:
New pool/ spa build
Permit Reviews
Permit Number - TC-RES-1125-05488
Permit Status: Inspections
Permit Description: New pool/ spa build
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/19/2025 | RESIDENTIAL POOL v.1 | 11/25/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-RES-1125-05488
Permit Status: Inspections
Permit Description: New pool/ spa build
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 11/20/2025 | Separate Permit is required for ramada prior to final. |
Conditions
Permit Number - TC-RES-1125-05488
Permit Status: Inspections
Permit Description: New pool/ spa build
| Date | Description | Comments |
|---|---|---|
| 11/19/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-1125-05488
Permit Description: New pool/ spa build
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/29/2026 | Pool/Spa - Bonding Grip | Passed | passed 1/29/26 | |
| 01/29/2026 | Pool/Spa - Electric | Passed | passed 1/29/26 | |
| 01/29/2026 | Pool/Spa - Plumbing | Passed | passed 1/29/26 | |
| 01/29/2026 | Pool/Spa - Pre-Gunite | Passed | passed 1/29/26 | |
| 01/29/2026 | RSEL - Electrical Progress | Passed | passed 1/29/26 | |
| 03/02/2026 | COT - BULD - SWG Clearance | Passed | 03/02/2026 Approved clearance for SWG. |
|
| 03/02/2026 | Pool/Spa - Final/Barrier | Passed | ||
| 03/02/2026 | RSBU - Building Final | Passed | ||
| 03/02/2026 | COT - RSEL - Electrical Final | Passed |