Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Residential Building - One or Two Family
Address NEW:
8884 E APACHE WELL PL
Apply Date:
11/10/2025
Applicant:
Trista Lashley
Description:
Install Aprox 160' of 2" Polyline and New 400K BTU Natural Gas Heater

Permit Reviews

Permit Number - TC-RES-1125-05447
Permit Status: Inspections
Permit Description: Install Aprox 160' of 2" Polyline and New 400K BTU Natural Gas Heater
Start Date Submittal Complete Date Status  
11/10/2025 RESIDENTIAL SIMPLE REVIEW v.1 11/12/2025 APPROVED Review Details

Conditions

Permit Number - TC-RES-1125-05447
Permit Status: Inspections
Permit Description: Install Aprox 160' of 2" Polyline and New 400K BTU Natural Gas Heater
Date Description Comments
11/10/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-RES-1125-05447
Permit Description: Install Aprox 160' of 2" Polyline and New 400K BTU Natural Gas Heater
Total Completed Inspections - 3
Date Description Inspector Results Comments
12/12/2025 COT - RSPL - Plumbing Final Passed 12/12/2025
Approved per plan, verified PE line with yellow tracer wire in proper trench depth holding under test at 15psi - okay to backfill with shading materials.
12/12/2025 COT - BULD - SWG Clearance Passed 12/12/2025
Clearance to Southwest Gas.
12/12/2025 COT - RSPL - Rough Soil Passed 12/12/2025
Approved per plan, verified PE line with yellow tracer wire in proper trench depth holding under test at 15psi - okay to backfill with shading materials.