Permit: TC-RES-1125-05387
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
2634 E CROYDEN ST
Address NEW:
2634 E CROYDEN ST
Apply Date:
11/05/2025
Applicant:
Liam Atchley
Description:
Install 18kw Generator, sub panel, transfer switch, and dedicated gas line
Permit Reviews
Permit Number - TC-RES-1125-05387
Permit Status: Inspections
Permit Description: Install 18kw Generator, sub panel, transfer switch, and dedicated gas line
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/05/2025 | RESIDENTIAL SIMPLE REVIEW v.1 | 11/06/2025 | APPROVED |
Conditions
Permit Number - TC-RES-1125-05387
Permit Status: Inspections
Permit Description: Install 18kw Generator, sub panel, transfer switch, and dedicated gas line
| Date | Description | Comments |
|---|---|---|
| 11/05/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-1125-05387
Permit Description: Install 18kw Generator, sub panel, transfer switch, and dedicated gas line
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/11/2025 | BULD - Electrical Clearance | Passed | 12/11/2025 Clearance TEP INCR for load side subpanel and transfer switch for generator. |
|
| 12/11/2025 | RSBU - Building Final | Passed | ||
| 12/11/2025 | COT - RSEL - Electrical Final | Passed | 12/11/2025 Approved per plan, added load side subpanel and transfer switch and EMT conduit along house for generator. |
|
| 12/11/2025 | COT - RSPL - Plumbing Final | Passed | 12/11/2025 Approved per plan, added galvanized steel 1" pipe braced and running 10' for generator. |
|
| 01/09/2026 | COT - BULD - SWG Clearance | Passed | 01/09/2026 Clearance for Southwest Gas. Passed inspection on 12/11/2025. SWG still needed clearance for 1" galvanized steel run along wall from meter to generator. |