Permit Details

Status:
Inspections
Type:
Residential Building - One or Two Family
Address NEW:
2634 E CROYDEN ST
Apply Date:
11/05/2025
Applicant:
Liam Atchley
Description:
Install 18kw Generator, sub panel, transfer switch, and dedicated gas line

Permit Reviews

Permit Number - TC-RES-1125-05387
Permit Status: Inspections
Permit Description: Install 18kw Generator, sub panel, transfer switch, and dedicated gas line
Start Date Submittal Complete Date Status  
11/05/2025 RESIDENTIAL SIMPLE REVIEW v.1 11/06/2025 APPROVED Review Details

Conditions

Permit Number - TC-RES-1125-05387
Permit Status: Inspections
Permit Description: Install 18kw Generator, sub panel, transfer switch, and dedicated gas line
Date Description Comments
11/05/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-RES-1125-05387
Permit Description: Install 18kw Generator, sub panel, transfer switch, and dedicated gas line
Total Completed Inspections - 5
Date Description Inspector Results Comments
12/11/2025 BULD - Electrical Clearance Passed 12/11/2025
Clearance TEP INCR for load side subpanel and transfer switch for generator.
12/11/2025 RSBU - Building Final Passed
12/11/2025 COT - RSEL - Electrical Final Passed 12/11/2025
Approved per plan, added load side subpanel and transfer switch and EMT conduit along house for generator.
12/11/2025 COT - RSPL - Plumbing Final Passed 12/11/2025
Approved per plan, added galvanized steel 1" pipe braced and running 10' for generator.
01/09/2026 COT - BULD - SWG Clearance Passed 01/09/2026
Clearance for Southwest Gas. Passed inspection on 12/11/2025. SWG still needed clearance for 1" galvanized steel run along wall from meter to generator.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PLANSET_V1_V1.PDF DOCUMENTS VIEW