Description:
Upgrade main electrical service due to age and condition. Supply and install (1) three phase 200amp meter base. Supply and install (1) three phase 200amp main breaker load center. Supply and install (2) three phase 60amp disconnects to operate existing well pump equipment. Install new riser, feeder cables, point of attachment. Install new grounding system.
Permit Reviews
Permit Number - TC-RES-1125-05382
Permit Status: Complete
Permit Description: Upgrade main electrical service due to age and condition. Supply and install (1) three phase 200amp meter base. Supply and install (1) three phase 200amp main breaker load center. Supply and install (2) three phase 60amp disconnects to operate existing well pump equipment. Install new riser, feeder cables, point of attachment. Install new grounding system.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/06/2025 | RESIDENTIAL SIMPLE REVIEW v.1 | 11/06/2025 | REQUIRES RESUBMIT |
| 11/13/2025 | RESIDENTIAL SIMPLE REVIEW v.2 | 11/13/2025 | APPROVED |
Conditions
Permit Number - TC-RES-1125-05382
Permit Status: Complete
Permit Description: Upgrade main electrical service due to age and condition. Supply and install (1) three phase 200amp meter base. Supply and install (1) three phase 200amp main breaker load center. Supply and install (2) three phase 60amp disconnects to operate existing well pump equipment. Install new riser, feeder cables, point of attachment. Install new grounding system.
| Date | Description | Comments |
|---|---|---|
| 11/06/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-1125-05382
Permite Description: Upgrade main electrical service due to age and condition. Supply and install (1) three phase 200amp meter base. Supply and install (1) three phase 200amp main breaker load center. Supply and install (2) three phase 60amp disconnects to operate existing well pump equipment. Install new riser, feeder cables, point of attachment. Install new grounding system.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/26/2026 | COT - RSEL - Electrical Final | N/A | Not Ready | 01/26/2026 Could not reach field contact. Left voicemail and text at 502-869-1962 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-1125-05382
Permit Description: Upgrade main electrical service due to age and condition. Supply and install (1) three phase 200amp meter base. Supply and install (1) three phase 200amp main breaker load center. Supply and install (2) three phase 60amp disconnects to operate existing well pump equipment. Install new riser, feeder cables, point of attachment. Install new grounding system.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/12/2026 | BULD - Electrical Clearance | Passed | Passed 1/12/26 Clearance INCR |