Permit: TC-RES-1124-06928
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
95 N CAMINO MIRAMONTE
Address NEW:
95 N CAMINO MIRAMONTE
Apply Date:
11/27/2024
Applicant:
Robin Hartman
Description:
Detached Carport
Permit Reviews
Permit Number - TC-RES-1124-06928
Permit Status: Inspections complete
Permit Description: Detached Carport
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/29/2024 | RESIDENTIAL NEW DWELLING v.1 | 01/06/2025 | APPROVED |
Conditions
Permit Number - TC-RES-1124-06928
Permit Status: Inspections complete
Permit Description: Detached Carport
| Date | Description | Comments |
|---|---|---|
| 11/29/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-1124-06928
Permite Description: Detached Carport
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/21/2025 | COT - RSBU - Masonry Pregrout | N/A | Partial Pass | Partial pass, ok to proceed with next section 2/21/25 |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-1124-06928
Permit Description: Detached Carport
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/27/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Footings for carport. Ok to place concrete in progress areas. | |
| 02/13/2025 | COT - RSBU - Preslab | Passed | Ok to place concrete in slab area. | |
| 03/04/2025 | COT - RSBU - Masonry Pregrout | Passed | Partial pass, ok to proceed with next section 3/4/25 | |
| 04/02/2025 | COT - RSBU - Roof Nailing | Passed | Ok to dry-in roof system. | |
| 04/16/2025 | COT - RSEL - Electrical Underground | Passed | Conduits from disconnects to sub-panel in garage. Ok to cover progress areas. | |
| 06/17/2025 | RSBU - Building Final | Passed | Passed 6/17/25 | |
| 06/17/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Passed 6/17/25 | |
| 06/17/2025 | COT - RSEL - Electrical Final | Passed | Passed 6/17/25 | |
| 06/17/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed 6/17/25 |