Permit: TC-RES-1124-06737
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
7322 E 42ND ST
Address NEW:
7322 E 42ND ST
Apply Date:
11/19/2024
Applicant:
Armando Garcia jr
Description:
Replace old 200amp 120/240 volt panel with new 200 amp 120/240volt panel
Permit Reviews
Permit Number - TC-RES-1124-06737
Permit Status: Inspections
Permit Description: Replace old 200amp 120/240 volt panel with new 200 amp 120/240volt panel
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/20/2024 | RESIDENTIAL SIMPLE REVIEW v.1 | 11/20/2024 | APPROVED |
Conditions
Permit Number - TC-RES-1124-06737
Permit Status: Inspections
Permit Description: Replace old 200amp 120/240 volt panel with new 200 amp 120/240volt panel
| Date | Description | Comments |
|---|---|---|
| 11/20/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-RES-1124-06737
Permite Description: Replace old 200amp 120/240 volt panel with new 200 amp 120/240volt panel
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/31/2025 | COT - RSEL - Electrical Final | N/A | Not Ready | 1/31/25 looking back in my notes, I was unable to contact the contractor. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-1124-06737
Permit Description: Replace old 200amp 120/240 volt panel with new 200 amp 120/240volt panel
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/16/2025 | BULD - Electrical Clearance | Passed | 1/16/25 approval for TEP INCR for replacement of old 200amp panel for new 200amp panel. |