Permit: TC-RES-1124-06659
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
10203 E WINDING TR
Address NEW:
10203 E WINDING TR
Apply Date:
11/14/2024
Applicant:
Alton Gillespie
Description:
Enclose Porch into Sitting Room
Permit Reviews
Permit Number - TC-RES-1124-06659
Permit Status: Complete
Permit Description: Enclose Porch into Sitting Room
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/14/2024 | RESIDENTIAL NEW DWELLING v.1 | 12/19/2024 | REQUIRES RESUBMIT |
| 01/21/2025 | RESTAMP - RESIDENTIAL v.1 | 01/21/2025 | APPROVED |
| 01/08/2025 | RESIDENTIAL NEW DWELLING v.2 | 01/21/2025 | APPROVED |
Conditions
Permit Number - TC-RES-1124-06659
Permit Status: Complete
Permit Description: Enclose Porch into Sitting Room
| Date | Description | Comments |
|---|---|---|
| 11/14/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-1124-06659
Permit Description: Enclose Porch into Sitting Room
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/13/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 02/13/2025 | COT - RSBU - Preslab | Passed | ||
| 02/24/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Passed 2/24/25 | |
| 02/24/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Passed 2/24/25 ok to drywall | |
| 02/24/2025 | COT - RSPL - Gas Pressure Test | Passed | Passed 2/24/25 held pressure | |
| 04/25/2025 | RSBU - Building Final | Passed | Passed final 4/25/25 | |
| 04/25/2025 | COT - RSEL - Electrical Final | Passed | Passed final 4/25/25 | |
| 04/25/2025 | COT - RSME - Mechanical Final | Passed | Passed final 4/25/25 | |
| 04/25/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 4/25/25 |