Permit: TC-RES-1124-06611
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
526 E GLENN ST
Address NEW:
526 E GLENN ST
Apply Date:
11/13/2024
Applicant:
Cesar Vinueza
Description:
This permit is to replace 27 feet of existing 3/4” steel gas line with 30 feet of new 1” steel gas line to Furnace, Water Heater (40 gallon), and Range. The new line will be run from the gas meter to above the duplex unit at 526 E Glenn St Tucson, AZ 85705 by Corral Pipeline Company LLC.
Permit Reviews
Permit Number - TC-RES-1124-06611
Permit Status: Complete
Permit Description: This permit is to replace 27 feet of existing 3/4” steel gas line with 30 feet of new 1” steel gas line to Furnace, Water Heater (40 gallon), and Range. The new line will be run from the gas meter to above the duplex unit at 526 E Glenn St Tucson, AZ 85705 by Corral Pipeline Company LLC.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/13/2024 | RESIDENTIAL SIMPLE REVIEW v.1 | 11/13/2024 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-1124-06611
Permite Description: This permit is to replace 27 feet of existing 3/4” steel gas line with 30 feet of new 1” steel gas line to Furnace, Water Heater (40 gallon), and Range. The new line will be run from the gas meter to above the duplex unit at 526 E Glenn St Tucson, AZ 85705 by Corral Pipeline Company LLC.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2024 | BULD - Electrical Clearance | N/A | Not Applicable | Plumbing was the only work done, clearance not needed |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-1124-06611
Permit Description: This permit is to replace 27 feet of existing 3/4” steel gas line with 30 feet of new 1” steel gas line to Furnace, Water Heater (40 gallon), and Range. The new line will be run from the gas meter to above the duplex unit at 526 E Glenn St Tucson, AZ 85705 by Corral Pipeline Company LLC.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/26/2024 | COT - BULD - SWG Clearance | Passed | 11/26/24 pass SWG Clearance | |
| 11/26/2024 | COT - RSPL - Plumbing Final | Passed | 11/26/24 pass |