Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
8804 E ARBOR ST
Apply Date:
11/12/2024
Applicant:
John McGaw
Description:
(12) NEW MEYER BURGER; MB_B120AyB_390 - 390W MODULES (12) NEW MICRO-INVERTERS; ENPHASE; IQ8M-72-2-US (1) NEW PV AC COMBINER PANEL WITH ENPHASE ENVOY MONITORING SYSTEM (1) NEW UTILITY DG DISCONNECT (1) NEW DG METER (1) NEW MAIN SERVICE PANEL SWAP - LIKE FOR LIKE NEW PHOTOVOLTAIC ROOF MOUNTING HARDWARE NEW INTEGRATED GROUND BONDING HARDWARE

Permit Reviews

Permit Number - TC-RES-1124-06563
Permit Status: Inspections
Permit Description: (12) NEW MEYER BURGER; MB_B120AyB_390 - 390W MODULES (12) NEW MICRO-INVERTERS; ENPHASE; IQ8M-72-2-US (1) NEW PV AC COMBINER PANEL WITH ENPHASE ENVOY MONITORING SYSTEM (1) NEW UTILITY DG DISCONNECT (1) NEW DG METER (1) NEW MAIN SERVICE PANEL SWAP - LIKE FOR LIKE NEW PHOTOVOLTAIC ROOF MOUNTING HARDWARE NEW INTEGRATED GROUND BONDING HARDWARE
Start Date Submittal Complete Date Status  
11/12/2024 RESIDENTIAL SOLAR v.1 12/12/2024 APPROVED Review Details

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-RES-1124-06563
Permite Description: (12) NEW MEYER BURGER; MB_B120AyB_390 - 390W MODULES (12) NEW MICRO-INVERTERS; ENPHASE; IQ8M-72-2-US (1) NEW PV AC COMBINER PANEL WITH ENPHASE ENVOY MONITORING SYSTEM (1) NEW UTILITY DG DISCONNECT (1) NEW DG METER (1) NEW MAIN SERVICE PANEL SWAP - LIKE FOR LIKE NEW PHOTOVOLTAIC ROOF MOUNTING HARDWARE NEW INTEGRATED GROUND BONDING HARDWARE
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
01/28/2025 BULD - Electrical Clearance N/A Partial Pass Partial for the 125A service panel upgrade - INCR Clearance was called into TEP at 12:40pm
Pending solar

Completed Inspections

Permit Status: Inspections
Permit Number: TC-RES-1124-06563
Permit Description: (12) NEW MEYER BURGER; MB_B120AyB_390 - 390W MODULES (12) NEW MICRO-INVERTERS; ENPHASE; IQ8M-72-2-US (1) NEW PV AC COMBINER PANEL WITH ENPHASE ENVOY MONITORING SYSTEM (1) NEW UTILITY DG DISCONNECT (1) NEW DG METER (1) NEW MAIN SERVICE PANEL SWAP - LIKE FOR LIKE NEW PHOTOVOLTAIC ROOF MOUNTING HARDWARE NEW INTEGRATED GROUND BONDING HARDWARE
Total Completed Inspections - 3
Date Description Inspector Results Comments
01/31/2025 BULD - Electrical Clearance Passed Approved - DGC Clearance to TEP is required for the solar meter
01/31/2025 RSBU - Building Final Passed
01/31/2025 COT - RSOL - Electrical Final Solar Project Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-AZ-R24098_VERNICK, RICHARD_PLANS_V1.PDF DOCUMENTS VIEW