Status:
Issued
Type:
Residential Building - One or Two Family
Address NEW:
2503 E PARKSIDE DR
Apply Date:
11/11/2024
Applicant:
Marytine Ramos
Description:
Installation of Roof mounted 3.60kW PV system /125A MPU

Permit Reviews

Permit Number - TC-RES-1124-06551
Permit Status: Issued
Permit Description: Installation of Roof mounted 3.60kW PV system /125A MPU
Start Date Submittal Complete Date Status  
03/10/2025 RESIDENTIAL SOLAR REVISION v.1 04/08/2025 APPROVED Review Details
11/12/2024 RESIDENTIAL SOLAR v.1 12/11/2024 APPROVED Review Details

Conditions

Permit Number - TC-RES-1124-06551
Permit Status: Issued
Permit Description: Installation of Roof mounted 3.60kW PV system /125A MPU
Date Description Comments
04/08/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Issued
Permit Number: TC-RES-1124-06551
Permit Description: Installation of Roof mounted 3.60kW PV system /125A MPU
Total Completed Inspections - 4
Date Description Inspector Results Comments
03/25/2025 RSBU - Building Final Passed
03/25/2025 COT - RSOL - Electrical Final Solar Project Passed
03/25/2025 COT - RSOL - Grounding/Bonding Solar Project Passed
03/25/2025 BULD - Electrical Clearance Passed