Permit: TC-RES-1124-06500
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
8916 E CALLE BOLIVAR
Address NEW:
8916 E CALLE BOLIVAR
Apply Date:
11/07/2024
Applicant:
Jeff Shoemaker
Description:
9.36kW roof mounted 24 panels. Tesla Powerwall 3, Tesla Expansion unit battery, Tesla backup switch, New 200A loadcenter, New 200A utility meter.
Permit Reviews
Permit Number - TC-RES-1124-06500
Permit Status: Complete
Permit Description: 9.36kW roof mounted 24 panels.
Tesla Powerwall 3, Tesla Expansion unit battery, Tesla backup switch, New 200A loadcenter, New 200A utility meter.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/07/2024 | RESIDENTIAL SOLAR v.1 | 12/10/2024 | REQUIRES RESUBMIT |
| 12/13/2024 | RESIDENTIAL SOLAR v.2 | 12/14/2024 | REQUIRES RESUBMIT |
| 12/17/2024 | RESIDENTIAL SOLAR v.3 | 12/17/2024 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-1124-06500
Permite Description: 9.36kW roof mounted 24 panels.
Tesla Powerwall 3, Tesla Expansion unit battery, Tesla backup switch, New 200A loadcenter, New 200A utility meter.
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/30/2024 | RSBU - Building Final | N/A | Not Ready | |
| 12/30/2024 | COT - RSOL - Electrical Final Solar Project | N/A | Not Ready | |
| 12/30/2024 | BULD - Electrical Clearance | N/A | Partial Pass | Partial pass. Verbal clearance to TEP INCR/DGL. Pending solar and battery clearance. 12/30/2024 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-1124-06500
Permit Description: 9.36kW roof mounted 24 panels.
Tesla Powerwall 3, Tesla Expansion unit battery, Tesla backup switch, New 200A loadcenter, New 200A utility meter.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/13/2025 | RSBU - Building Final | Passed | ||
| 01/13/2025 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 01/13/2025 | BULD - Electrical Clearance | Passed | approved solar and PW 3 battery - DGC/BAT Clearance to TEP is required for the solar meter |