Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Apply Date:
11/06/2024
Applicant:
Sue Wilson
Description:
interior hot & cold repipe of the domestic water distribution system

Permit Reviews

Permit Number - TC-RES-1124-06465
Permit Status: Inspections complete
Permit Description: interior hot & cold repipe of the domestic water distribution system
Start Date Submittal Complete Date Status  
11/06/2024 RESIDENTIAL SIMPLE REVIEW v.1 11/06/2024 APPROVED Review Details

Conditions

Permit Number - TC-RES-1124-06465
Permit Status: Inspections complete
Permit Description: interior hot & cold repipe of the domestic water distribution system
Date Description Comments
11/06/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-1124-06465
Permit Description: interior hot & cold repipe of the domestic water distribution system
Total Completed Inspections - 2
Date Description Inspector Results Comments
11/22/2024 COT - RSPL - Plumbing Final Passed 11/22/24: Water line in garage has been insulated, water lies in walls have been secured to studs, backing has been installed behind shower valves, and hammer arrestor has been installed under kitchen sink for dishwasher supply line. Okay to proceed with drywall installation and repair.
11/22/2024 RSPL - Plumbing Progress Passed 11/22/24: Water line in garage has been insulated, water lies in walls have been secured to studs, backing has been installed behind shower valves, and hammer arrestor has been installed under kitchen sink for dishwasher supply line. Okay to proceed with drywall installation and repair.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BRNB42200BAB205_004197_V1.PDF DOCUMENTS VIEW