Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
8930 E BEARS PATH RD
Apply Date:
11/06/2024
Applicant:
Daniel Dominguz
Description:
Replace 120V/208V three phase meter and 100 amp 120v/280v three phase panel with new 120V/208V three phase meter and 100 amp 120v/280v three phase panel at existing location of service pole.

Permit Reviews

Permit Number - TC-RES-1124-06451
Permit Status: Complete
Permit Description: Replace 120V/208V three phase meter and 100 amp 120v/280v three phase panel with new 120V/208V three phase meter and 100 amp 120v/280v three phase panel at existing location of service pole.
Start Date Submittal Complete Date Status  
11/06/2024 RESIDENTIAL SIMPLE REVIEW v.1 11/06/2024 APPROVED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-1124-06451
Permit Description: Replace 120V/208V three phase meter and 100 amp 120v/280v three phase panel with new 120V/208V three phase meter and 100 amp 120v/280v three phase panel at existing location of service pole.
Total Completed Inspections - 2
Date Description Inspector Results Comments
02/18/2025 COT - RSEL - Electrical Final Passed Well
02/18/2025 BULD - Electrical Clearance Passed Approved 100A 3-phase service panel upgrade - INCR Clearance was called into TEP at 1:05pm

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BEAR PATH SITE PLAN (1)_V1.PDF DOCUMENTS VIEW