Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
916 E 6TH ST
Apply Date:
11/04/2024
Applicant:
Gary Schad
Description:
changing out 100amp main breaker panel to a 100 amp main breaker panel

Permit Reviews

Permit Number - TC-RES-1124-06374
Permit Status: Inspections complete
Permit Description: changing out 100amp main breaker panel to a 100 amp main breaker panel
Start Date Submittal Complete Date Status  
11/04/2024 RESIDENTIAL SIMPLE REVIEW v.1 11/04/2024 APPROVED Review Details

Conditions

Permit Number - TC-RES-1124-06374
Permit Status: Inspections complete
Permit Description: changing out 100amp main breaker panel to a 100 amp main breaker panel
Date Description Comments
11/04/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-1124-06374
Permite Description: changing out 100amp main breaker panel to a 100 amp main breaker panel
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
12/18/2024 RSEL - Electrical Progress N/A Not Applicable

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-1124-06374
Permit Description: changing out 100amp main breaker panel to a 100 amp main breaker panel
Total Completed Inspections - 2
Date Description Inspector Results Comments
12/18/2024 COT - RSEL - Electrical Final Passed
12/18/2024 BULD - Electrical Clearance Passed Approved 100A service panel upgrade - INCR Clearance was called into TEP at 2:00pm

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
20241104_082706_V1.PDF DOCUMENTS VIEW