Permit: TC-RES-1123-09722
Permit Details
Apply Date:
11/27/2023
Applicant:
FUSION
Description:
PV SOLAR INSTALLATION / MAIN PANEL UPGRADE 225A LIKE FOR LIKE 25 modules
Permit Reviews
Permit Number - TC-RES-1123-09722
Permit Status: Issued
Permit Description: PV SOLAR INSTALLATION / MAIN PANEL UPGRADE 225A LIKE FOR LIKE
25 modules
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
11/27/2023 | RESIDENTIAL SOLAR v.1 | 12/20/2023 | APPROVED |
Conditions
Permit Number - TC-RES-1123-09722
Permit Status: Issued
Permit Description: PV SOLAR INSTALLATION / MAIN PANEL UPGRADE 225A LIKE FOR LIKE
25 modules
Date | Description | Comments |
---|---|---|
12/21/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-RES-1123-09722
Permit Description: PV SOLAR INSTALLATION / MAIN PANEL UPGRADE 225A LIKE FOR LIKE
25 modules
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/08/2024 | RSBU - Building Final | Passed | ||
02/08/2024 | COT - RSOL - Electrical Final Solar Project | Passed | ||
02/08/2024 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter |