Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
9706 E 2ND ST
Address NEW:
9706 E 2ND ST
Apply Date:
11/27/2023
Applicant:
TFS Solar
Description:
roof mount 5.74 kW DC photovoltaic solar system; 14 modules and microinverters, 2 branches, PV combiner box, interconnection via meter socket adapter to 150A MLO Load Center bus with 150A MCB Meter Main

Permit Reviews

Permit Number - TC-RES-1123-09717
Permit Status: Complete
Permit Description: roof mount 5.74 kW DC photovoltaic solar system; 14 modules and microinverters, 2 branches, PV combiner box, interconnection via meter socket adapter to 150A MLO Load Center bus with 150A MCB Meter Main
Start Date Submittal Complete Date Status  
01/03/2024 RESIDENTIAL SOLAR v.2 01/24/2024 APPROVED Review Details
02/06/2024 RESTAMP - RESIDENTIAL v.1 02/06/2024 APPROVED Review Details
11/27/2023 RESIDENTIAL SOLAR v.1 12/20/2023 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-1123-09717
Permite Description: roof mount 5.74 kW DC photovoltaic solar system; 14 modules and microinverters, 2 branches, PV combiner box, interconnection via meter socket adapter to 150A MLO Load Center bus with 150A MCB Meter Main
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
02/27/2024 BULD - Electrical Clearance N/A Partial Pass 2/27/24 DGL partial pass future solar

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-1123-09717
Permit Description: roof mount 5.74 kW DC photovoltaic solar system; 14 modules and microinverters, 2 branches, PV combiner box, interconnection via meter socket adapter to 150A MLO Load Center bus with 150A MCB Meter Main
Total Completed Inspections - 3
Date Description Inspector Results Comments
03/04/2024 RSBU - Building Final Passed
03/04/2024 COT - RSOL - Electrical Final Solar Project Passed
03/04/2024 BULD - Electrical Clearance Passed Approved, DGC/DGL Clearance to TEP is required for the solar meter and meter collar

Documents

File Name Document Type  
CONS-BURCHILL, H. PV 5.74 KW-DRAWINGS_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BURCHILL, H. PV 5.74 KW-FLOOD PERMIT APPROVED_V1.PDF DOCUMENTS VIEW
CONS-BURCHILL, H. PV 5.74 KW-DRAWINGS_V2.PDF DOCUMENTS VIEW