Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-1123-09571
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
4215 E PARTING WATERS WY
Apply Date:
11/17/2023
Applicant:
Perla Vargas
Description:
Install a AC SYSTEM SIZE: 7.6 KW AC DC SYSTEM SIZE: 11.6 KW DC LAT, 32.2694578035134 LONG, -110.90350584348838 (29) SILFAB SIL - 400 HC + PV MODULES (1) TESLA SOLAR INVERTER 7.6 INVERTER(S) (11) TESLA MCI-1 OPTIMIZERS
Permit Reviews
Permit Number - TC-RES-1123-09571
Permit Status: Inspections complete
Permit Description: Install a AC SYSTEM SIZE: 7.6 KW AC
DC SYSTEM SIZE: 11.6 KW DC
LAT, 32.2694578035134
LONG, -110.90350584348838
(29) SILFAB SIL - 400 HC + PV MODULES
(1) TESLA SOLAR INVERTER 7.6 INVERTER(S)
(11) TESLA MCI-1 OPTIMIZERS
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/18/2023 | RESIDENTIAL SOLAR v.2 | 12/20/2023 | APPROVED |
11/17/2023 | RESIDENTIAL SOLAR v.1 | 12/14/2023 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-1123-09571
Permite Description: Install a AC SYSTEM SIZE: 7.6 KW AC
DC SYSTEM SIZE: 11.6 KW DC
LAT, 32.2694578035134
LONG, -110.90350584348838
(29) SILFAB SIL - 400 HC + PV MODULES
(1) TESLA SOLAR INVERTER 7.6 INVERTER(S)
(11) TESLA MCI-1 OPTIMIZERS
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/11/2024 | BULD - Electrical Clearance | N/A | Not Ready | |
01/11/2024 | COT - RSOL - Electrical Final Solar Project | N/A | Not Ready | |
01/11/2024 | RSBU - Building Final | N/A | Not Ready |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-1123-09571
Permit Description: Install a AC SYSTEM SIZE: 7.6 KW AC
DC SYSTEM SIZE: 11.6 KW DC
LAT, 32.2694578035134
LONG, -110.90350584348838
(29) SILFAB SIL - 400 HC + PV MODULES
(1) TESLA SOLAR INVERTER 7.6 INVERTER(S)
(11) TESLA MCI-1 OPTIMIZERS
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/16/2024 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter | |
01/16/2024 | COT - RSOL - Electrical Final Solar Project | Passed | ||
01/16/2024 | RSBU - Building Final | Passed |