Permit Details

Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Apply Date:
11/15/2023
Applicant:
Natalia Soto
Description:
10.500 kW rooftop PV solar system installation 25 modules

Permit Reviews

Permit Number - TC-RES-1123-09526
Permit Status: Inspections complete
Permit Description: 10.500 kW rooftop PV solar system installation 25 modules
Start Date Submittal Complete Date Status  
11/16/2023 RESIDENTIAL SOLAR v.1 12/12/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-RES-1123-09526
Permit Status: Inspections complete
Permit Description: 10.500 kW rooftop PV solar system installation 25 modules
Total Outstanding Activity Conditions - 1
Date Name
07/18/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-RES-1123-09526
Permit Status: Inspections complete
Permit Description: 10.500 kW rooftop PV solar system installation 25 modules
Date Description Comments
07/18/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-1123-09526
Permite Description: 10.500 kW rooftop PV solar system installation 25 modules
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
01/22/2024 BULD - Electrical Clearance N/A Not Applicable duplicate

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-1123-09526
Permit Description: 10.500 kW rooftop PV solar system installation 25 modules
Total Completed Inspections - 3
Date Description Inspector Results Comments
01/23/2024 RSBU - Building Final Passed
01/23/2024 COT - RSOL - Electrical Final Solar Project Passed
01/23/2024 BULD - Electrical Clearance Passed Approved, DGC Clearance to TEP is required for the solar meter

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-128498 - FABIENNE LOUIS - R1.3_V1.PDF DOCUMENTS VIEW