Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
1520 W ONTARIO ST
Apply Date:
11/13/2023
Applicant:
Jennifer Sanchez
Description:
Enclosure Carport into Living Room

Permit Reviews

Permit Number - TC-RES-1123-09460
Permit Status: Complete
Permit Description: Enclosure Carport into Living Room
Start Date Submittal Complete Date Status  
11/14/2023 RESIDENTIAL NEW DWELLING v.1 12/07/2023 APPROVED Review Details

Conditions

Permit Number - TC-RES-1123-09460
Permit Status: Complete
Permit Description: Enclosure Carport into Living Room
Date Description Comments
12/13/2023 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
12/07/2023 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-1123-09460
Permit Description: Enclosure Carport into Living Room
Total Completed Inspections - 8
Date Description Inspector Results Comments
02/26/2024 COT - RSBU - Masonry Pregrout Passed Final lift okay to grout. 2/26/2024
03/04/2024 COT - RSBU - Preslab Passed 1/19/24: footing reinforcement per plan ok to proceed. Pre-slab will be called in under excavation/rebar/zoning in the future.
3/4/24: Preslab reinforcement per plan ok to pour.
03/04/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 1/19/24: footing reinforcement per plan ok to proceed. Pre-slab will be called in under excavation/rebar/zoning in the future.
3/4/24: Preslab reinforcement per plan ok to pour.
03/22/2024 COT - RSBU - Roof Nailing Passed
04/04/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
05/17/2024 RSBU - Building Final Passed
03/10/2026 COT - RSME - Mechanical Final Passed
03/10/2026 COT - RSEL - Electrical Final Passed

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION (SSRS).PDF DOCUMENTS VIEW
OWNER BUILDER AFFIDAVIT 2_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-PLAN_SET_V1.PDF DOCUMENTS VIEW