Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
11/01/2023
Applicant:
Jose Quintero
Description:
ADU Unit 2 ADDRESSING REQUESTED FROM PIMA COUNTY P23AD00494

Permit Reviews

Permit Number - TC-RES-1123-09194
Permit Status: Complete
Permit Description: ADU Unit 2 ADDRESSING REQUESTED FROM PIMA COUNTY P23AD00494
Start Date Submittal Complete Date Status  
09/30/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/04/2024 APPROVED Review Details
12/08/2023 RESIDENTIAL NEW DWELLING v.2 12/14/2023 APPROVED Review Details
11/06/2023 RESIDENTIAL NEW DWELLING v.1 11/21/2023 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-RES-1123-09194
Permit Status: Complete
Permit Description: ADU Unit 2 ADDRESSING REQUESTED FROM PIMA COUNTY P23AD00494
Date Description Comments
12/14/2023 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
10/04/2023 This project is within a floodplain and requires an elevation certificate. Submission and Issuance of a Floodplain Use Permit (FUP) is required PRIOR TO ISSUANCE of this permit. An intermediate Elevation Certificate is required PRIOR TO GRADING and/or PRE-SLAB INSPECTION. Submission of the final Elevation Certificate and completion of the Floodplain Use Permit is required PRIOR TO FINALING this permit.
11/20/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-1123-09194
Permit Description: ADU Unit 2 ADDRESSING REQUESTED FROM PIMA COUNTY P23AD00494
Total Completed Inspections - 16
Date Description Inspector Results Comments
01/30/2024 COT - RSPL - Rough Soil Passed Okay to backfill. Shading is required. 1/30/2024
01/31/2024 COT - RSBU - Preslab Passed Rebar per plan okay for concrete placement in footings and slab. 1/31/2024
01/31/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Rebar per plan okay for concrete placement in footings and slab. 1/31/2024
01/31/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO UNIT #2. 1/31/2024
01/31/2024 COT - RSEL - Grounding/Bonding Passed
02/09/2024 COT - RSPL - Sewer Passed
02/20/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
02/20/2024 COT - RSBU - Roof Nailing Passed
03/14/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/07/2024 COT - RSEL - Electrical Underground Passed
06/07/2024 RSBU - Building Final Passed
06/07/2024 COT - RSEL - Electrical Final Passed
06/07/2024 COT - RSEL - Outdoor Lighting Passed
06/07/2024 COT - RSME - Mechanical Final Passed
06/07/2024 COT - RSPL - Plumbing Final Passed
06/07/2024 COT - RSPL - Yard Water Line Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
MODEL 505 TRUSS CALCS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-2380 N NORRIS AVE UNIT 2 CASITA 12-1-23_V2.PDF DOCUMENTS VIEW