Permit: TC-RES-1122-00983
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
234 E ELM ST UNIT 1
Address NEW:
234 E ELM ST UNIT 1
Apply Date:
11/21/2022
Applicant:
BRANDY PALCHETTI
Description:
• SYSTEM SIZE: 3650W DC, 2900W AC • MODULES: (10) LONGI GREEN ENERGY TECHNOLOGY CO LTD: LR4-60HPH-365M • INVERTERS: (10) ENPHASE ENERGY: IQ8PLUS-72-2-US • RACKING: ULTRA RAIL SPEEDSEAL FOOT, SEE DRAWING SNR-DC-00438; SOLLEGA FASTRACK510 WITH 304 STAINLESS STEEL HARDWARE
Permit Reviews
Permit Number - TC-RES-1122-00983
Permit Status: Issued
Permit Description: • SYSTEM SIZE: 3650W DC, 2900W AC
• MODULES: (10) LONGI GREEN ENERGY TECHNOLOGY CO
LTD: LR4-60HPH-365M
• INVERTERS: (10) ENPHASE ENERGY: IQ8PLUS-72-2-US
• RACKING: ULTRA RAIL SPEEDSEAL FOOT, SEE DRAWING
SNR-DC-00438; SOLLEGA FASTRACK510 WITH 304
STAINLESS STEEL HARDWARE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/29/2022 | RESIDENTIAL SOLAR v.1 | 11/29/2022 | REQUIRES RESUBMIT |
| 04/13/2023 | RESIDENTIAL SOLAR v.4 | 04/18/2023 | APPROVED |
| 02/02/2023 | RESIDENTIAL SOLAR v.2 | 02/15/2023 | REQUIRES RESUBMIT |
| 04/10/2023 | RESIDENTIAL SOLAR v.3 | 04/10/2023 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-RES-1122-00983
Permite Description: • SYSTEM SIZE: 3650W DC, 2900W AC
• MODULES: (10) LONGI GREEN ENERGY TECHNOLOGY CO
LTD: LR4-60HPH-365M
• INVERTERS: (10) ENPHASE ENERGY: IQ8PLUS-72-2-US
• RACKING: ULTRA RAIL SPEEDSEAL FOOT, SEE DRAWING
SNR-DC-00438; SOLLEGA FASTRACK510 WITH 304
STAINLESS STEEL HARDWARE
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/10/2023 | BULD - Electrical Clearance | N/A | Canceled | 5/10/23: Cancelled by contractor. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-RES-1122-00983
Permit Description: • SYSTEM SIZE: 3650W DC, 2900W AC
• MODULES: (10) LONGI GREEN ENERGY TECHNOLOGY CO
LTD: LR4-60HPH-365M
• INVERTERS: (10) ENPHASE ENERGY: IQ8PLUS-72-2-US
• RACKING: ULTRA RAIL SPEEDSEAL FOOT, SEE DRAWING
SNR-DC-00438; SOLLEGA FASTRACK510 WITH 304
STAINLESS STEEL HARDWARE
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/11/2023 | BULD - Electrical Clearance | Passed | 5/11/23 - Approved, DGC Clearance to TEP is required for the solar meter , unit #1 | |
| 05/11/2023 | COT - RSEL - Electrical Final | Passed | ||
| 05/11/2023 | RSBU - Building Final | Passed |