Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
427 N 3RD AV
Address NEW:
427 N 3RD AV
Apply Date:
10/27/2026
Applicant:
Jeremy Perea
Description:
Gas line repair on existing gas line and pressure test

Permit Reviews

Permit Number - TC-RES-1026-05964
Permit Status: Inspections
Permit Description: Gas line repair on existing gas line and pressure test
Start Date Submittal Complete Date Status  
10/27/2026 RESIDENTIAL SIMPLE REVIEW v.1 10/28/2026 APPROVED Review Details

Conditions

Permit Number - TC-RES-1026-05964
Permit Status: Inspections
Permit Description: Gas line repair on existing gas line and pressure test
Date Description Comments
10/28/2026 Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-RES-1026-05964
Permite Description: Gas line repair on existing gas line and pressure test
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
COT - LCPL - Gas Final N/A Scheduled
COT - LCPL - Gas Pressure Test N/A Scheduled
COT - RSEL - Grounding/Bonding N/A Scheduled

Scheduled Inspections

Scheduled Inspections - TC-RES-1026-05964
Status: Inspections
Description: Gas line repair on existing gas line and pressure test
Scheduled Date Description Entered By Entered Date
11/02/2026 COT - LCPL - Gas Pressure Test Scheduled
11/02/2026 COT - LCPL - Gas Final Scheduled
11/02/2026 COT - RSEL - Grounding/Bonding Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
427 NORTH 3RD AVE GAS LINE DRAWING_V1.PDF DOCUMENTS VIEW