Permit: TC-RES-1026-05928
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
74 W KENNEDY ST
Address NEW:
74 W KENNEDY ST
Apply Date:
10/26/2026
Applicant:
Nicole Nyffeler
Description:
gas line from new meter up onto roof for roof furnace and water heater , with line around corner and into home for stove as discussed
Permit Reviews
Permit Number - TC-RES-1026-05928
Permit Status: Complete
Permit Description: gas line from new meter up onto roof for roof furnace
and water heater , with line around corner and into home for stove as discussed
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/26/2026 | RESIDENTIAL SIMPLE REVIEW v.1 | 10/28/2026 | APPROVED |
Conditions
Permit Number - TC-RES-1026-05928
Permit Status: Complete
Permit Description: gas line from new meter up onto roof for roof furnace
and water heater , with line around corner and into home for stove as discussed
| Date | Description | Comments |
|---|---|---|
| 10/28/2026 | Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-1026-05928
Permit Description: gas line from new meter up onto roof for roof furnace
and water heater , with line around corner and into home for stove as discussed
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/24/2026 | COT - LCPL - Gas Final | Passed | 11-24-26 gas final approved | |
| 11/24/2026 | COT - LCPL - Gas Pressure Test | Passed | 11-24-26 approved | |
| 11/24/2026 | COT - RSEL - Grounding/Bonding | Passed | ||
| 11/24/2026 | COT - BULD - SWG Clearance | Passed | 11-24-26 SWG clearance approved |