Permit: TC-RES-1026-05840
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
940 S SARNOFF DR
Address NEW:
940 S SARNOFF DR
Apply Date:
10/20/2026
Applicant:
Daniel Smith
Description:
Water Service Line Replacement: Remove and replace the existing main water service line from the water meter to the home's existing water service connection. Install approximately 60 linear feet of new 1-inch Uponor AquaPEX water service piping utilizing an approved underground trenching method. Total developed water piping length is approximately 110 feet, with a total demand of 16 WSFU. Make all necessary connections at the existing water meter and home's water service riser. Upon completion, pressure-test the new water service line, inspect all connections for leaks, restore water service, and verify proper system operation. Gas Service Line Replacement and Repipe: Install a new underground gas service line and repipe the residential gas distribution system serving the existing residence. Work includes approximately 60 linear feet of 1¼-inch polyethylene underground gas piping installed in a trench approximately 24 inches deep, connecting the existing gas meter to the home's gas distribution system. Install approximately 150 linear feet of total developed gas piping, including appropriately sized ¾-inch and ½-inch piping sections as indicated on the submitted gas piping diagram. The new gas distribution system will serve three existing gas appliances: Furnace: 100,000 BTU/hr Furnace: 40,000 BTU/hr Range: 65,000 BTU/hr Total connected gas appliance load: 205,000 BTU/hr. Install all necessary fittings, approved transitions, connections, supports, and appliance shutoff valves as applicable. Upon completion, perform the required gas piping pressure test to verify system integrity, inspect all accessible connections, and coordinate required inspections prior to placing the new gas distribution system into service.
Permit Reviews
Permit Number - TC-RES-1026-05840
Permit Status: Complete
Permit Description: Water Service Line Replacement:
Remove and replace the existing main water service line from the water meter to the home's existing water service connection. Install approximately 60 linear feet of new 1-inch Uponor AquaPEX water service piping utilizing an approved underground trenching method. Total developed water piping length is approximately 110 feet, with a total demand of 16 WSFU.
Make all necessary connections at the existing water meter and home's water service riser. Upon completion, pressure-test the new water service line, inspect all connections for leaks, restore water service, and verify proper system operation.
Gas Service Line Replacement and Repipe:
Install a new underground gas service line and repipe the residential gas distribution system serving the existing residence. Work includes approximately 60 linear feet of 1¼-inch polyethylene underground gas piping installed in a trench approximately 24 inches deep, connecting the existing gas meter to the home's gas distribution system.
Install approximately 150 linear feet of total developed gas piping, including appropriately sized ¾-inch and ½-inch piping sections as indicated on the submitted gas piping diagram. The new gas distribution system will serve three existing gas appliances:
Furnace: 100,000 BTU/hr
Furnace: 40,000 BTU/hr
Range: 65,000 BTU/hr
Total connected gas appliance load: 205,000 BTU/hr.
Install all necessary fittings, approved transitions, connections, supports, and appliance shutoff valves as applicable. Upon completion, perform the required gas piping pressure test to verify system integrity, inspect all accessible connections, and coordinate required inspections prior to placing the new gas distribution system into service.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/20/2026 | RESIDENTIAL SIMPLE REVIEW v.1 | 10/21/2026 | APPROVED |
Conditions
Permit Number - TC-RES-1026-05840
Permit Status: Complete
Permit Description: Water Service Line Replacement:
Remove and replace the existing main water service line from the water meter to the home's existing water service connection. Install approximately 60 linear feet of new 1-inch Uponor AquaPEX water service piping utilizing an approved underground trenching method. Total developed water piping length is approximately 110 feet, with a total demand of 16 WSFU.
Make all necessary connections at the existing water meter and home's water service riser. Upon completion, pressure-test the new water service line, inspect all connections for leaks, restore water service, and verify proper system operation.
Gas Service Line Replacement and Repipe:
Install a new underground gas service line and repipe the residential gas distribution system serving the existing residence. Work includes approximately 60 linear feet of 1¼-inch polyethylene underground gas piping installed in a trench approximately 24 inches deep, connecting the existing gas meter to the home's gas distribution system.
Install approximately 150 linear feet of total developed gas piping, including appropriately sized ¾-inch and ½-inch piping sections as indicated on the submitted gas piping diagram. The new gas distribution system will serve three existing gas appliances:
Furnace: 100,000 BTU/hr
Furnace: 40,000 BTU/hr
Range: 65,000 BTU/hr
Total connected gas appliance load: 205,000 BTU/hr.
Install all necessary fittings, approved transitions, connections, supports, and appliance shutoff valves as applicable. Upon completion, perform the required gas piping pressure test to verify system integrity, inspect all accessible connections, and coordinate required inspections prior to placing the new gas distribution system into service.
| Date | Description | Comments |
|---|---|---|
| 10/21/2026 | Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-1026-05840
Permit Description: Water Service Line Replacement:
Remove and replace the existing main water service line from the water meter to the home's existing water service connection. Install approximately 60 linear feet of new 1-inch Uponor AquaPEX water service piping utilizing an approved underground trenching method. Total developed water piping length is approximately 110 feet, with a total demand of 16 WSFU.
Make all necessary connections at the existing water meter and home's water service riser. Upon completion, pressure-test the new water service line, inspect all connections for leaks, restore water service, and verify proper system operation.
Gas Service Line Replacement and Repipe:
Install a new underground gas service line and repipe the residential gas distribution system serving the existing residence. Work includes approximately 60 linear feet of 1¼-inch polyethylene underground gas piping installed in a trench approximately 24 inches deep, connecting the existing gas meter to the home's gas distribution system.
Install approximately 150 linear feet of total developed gas piping, including appropriately sized ¾-inch and ½-inch piping sections as indicated on the submitted gas piping diagram. The new gas distribution system will serve three existing gas appliances:
Furnace: 100,000 BTU/hr
Furnace: 40,000 BTU/hr
Range: 65,000 BTU/hr
Total connected gas appliance load: 205,000 BTU/hr.
Install all necessary fittings, approved transitions, connections, supports, and appliance shutoff valves as applicable. Upon completion, perform the required gas piping pressure test to verify system integrity, inspect all accessible connections, and coordinate required inspections prior to placing the new gas distribution system into service.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/23/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 10/23/2026 | COT - BULD - SWG Clearance | Passed | SWG gas clearance sent in at 12:43 via email. | |
| 10/23/2026 | COT - RSPL - Rough Soil | Passed | ||
| 10/23/2026 | COT - RSPL - Yard Water Line | Passed | ||
| 10/23/2026 | RSPL - Plumbing Progress | Passed |